ESI Offers Comprehensive Solutions that Prevent Diesel Engine and Generator Fuel-Related Failure

CFS-1000 PLC SERIES
Bookmark and Share

Click Here for a Printable Datasheet

 


Generator failure can cost significant power downtime and major financial loss to your organization.  ESI provides solutions for protecting your business from disruption and ensures the continuation of mission critical operations.  Our logistical approach to a secure, managed fuel supply and  years of industry leading expertise in fuel polishing design provides our clients with reliable security and guaranteed uptime.


The CFS-1000 PLC Series offers a "plug and play" solution for businesses with a tank size of up to 2,000 gallons.  These systems feature an automated microprocessor and are available in a weather-tight enclosure.

 

 

Designed for:

1000_graphic


Highlights include:


  • High Flow Rate: 180 gal/hr polishes a 1,000 gallon tank 150% in 8.5 hours
  • Three-Stage Filtration: Turbine separator;  2-micron pleated particulate element;  coalescer plate for water and fine particulate removal
  • Water Separation: Free and emulsified with 99.95% efficiency
  • Automated Operation: Microprocessor controls
  • Plug & play installation
  • Available in weather-tight enclosure
  • Designed to accompany small generators with sub-base tanks
cfs-1000

 

ESI's patented technology removes water, sediment and microbes; and cleans tanks

 

 

CASE STUDY

ESI ASSIGNMENT: ENSURE RELIABILITY OF GENERATOR
UNITED STATES DEPARTMENT OF DEFENSE, FORCE PROTECTION PROGRAM


Generator failure can cost significant power downtime and major financial loss to your organization.  ESI provides solutions for protecting your business from disruption and ensuring mission critical operations.  Our approach to managed fuel supply and  years of industry leading expertise in fuel polishing design, provides our clients with the utmost in security and uptime.

 

The CFS-100 PLC Series offers a "plug and play" solution for business with a tank size of up to 2,000 gallons.  The series features a automated microprocessor and is available in a weather tight enclosure.

 
 

For Further Information

 

If you have any questions, comments, or to discuss your fuel system needs or problems with a fuel management engineer, please contact ESI Total Fuel Management:
USA:1-800-411-3284, Internationally: +1-703-263-7600, email: info@fuelmanagement.com

 


ESI Total Fuel Managment

Chantilly, VA * Hannover, Germany

 

Follow us on Linkedin linkedin_logo50

Corporate Headquarters:

4200 Lafayette Center Dr. Suite B
Chantilly, VA 20151

 

 

Toll Free: 800-411-3284
International: 703-263-7600
Fax: 703-817-7776

 

Why ESI is the Leader in the Fuel Polishing Industry

 

esi-seal


  • Over 400 Million Gallons of Fuel Polished Worldwide
  • 15+ Years of Field Tested Equipment with No Fuel Failures
  • Industry Defining Patented Technology
  • Philosophy of Customer-Driven Innovation & Improvement
  • Complete End to End Solutions with Value Added Services

Copyright © 2014. ESI Total Fuel Management. Powered by GENEDGE